Customization: | Available |
---|---|
After-sales Service: | Provide Regular Maintenance Guidance |
Warranty: | 1 Year |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Three and Four Eye Plates Triangular and Square Eye Plates
The three-eye plate and four-eye plate are used for the connection between anchor chains and can connect three or four anchor chains at the same time. The body is integrally forged with special materials which improves the tensile strength. It is widely used for the connection and matching of aquaculture moorings
Stock No. | Chain Size(MM) | A(MM) | B(MM) | C(MM) | D(MM) | Proof Load(T) | Breaking Load(T) | Weight(KG) |
HSM030613001 | 38-46 | 320 | 168 | 50 | 76 | 81.2 | 106 | 13 |
HSM030613002 | 48-56 | 360 | 184 | 60 | 88 | 127 | 181 | 25 |
HSM030613003 | 58-38 | 430 | 225 | 80 | 102 | 190 | 287 | 50 |
HSM030613004 | 70-73 | 506 | 266 | 90 | 120 | 270 | 404 | 81 |
Haosail's Supply Chain Management Team, Quality Management System and kinds of Testing Equipments ensure complete confidence in the products and services provided, and to ensure customer satisfaction.
√ Getting things right first time
√ Know kinds of factory well, know their production capacity and advantages, resource allocation, can quick response to all kinds of problems.
√ Develop product cost model independently, get hold of product cost composition
√ Overall optimization design, reduce the cost and the risk
√ Offer products and services that are better in quality or performance than those offered by the competition
√ Customer specifications strictly observed and fulfilled.
We can Technical Design:
Our team have a depth of technical ability and knowledge gained through many years of experience in lifting, rigging and safety. We can provide common lifting design, heavy work lifting design, and can non-standard product lifting design to meet customer needs.
We can do Training:
In order to better serve customers, our company specially organized professionals to carry out training in lifting design, lifting product introduction and use, and lifting product maintenance.
Q:What problems should be paid attention to in the construction and maintenance of offshore mooring design?
A:1. In terms of construction:
Preparation before construction: Before construction, the design drawings should be reviewed in detail to ensure that the construction personnel understand the design intention, and the construction sea area should be surveyed again to confirm whether the site conditions are consistent with the design expectations. Prepare the equipment and materials required for construction, such as windlass, pile driver, mooring cable, etc., and check whether its quality and performance meet the requirements.
Construction process control: Operate in strict accordance with construction specifications and design requirements to ensure the installation accuracy of mooring equipment. For example, the positioning deviation of the anchor should be controlled within the allowable range to ensure the uniform force of the mooring system. The tension of the mooring cable should be adjusted according to the design value to avoid too loose or too tight. During the construction process, it is necessary to monitor the weather and sea state changes in real time, and in case of bad weather, the construction should be stopped in time and corresponding protective measures should be taken.
Construction safety management: the offshore construction environment is complex and the safety risk is high. Construction personnel must be equipped with complete safety protective equipment, such as life jackets, helmets, etc. Establish a sound safety management system, strengthen safety education and training for construction personnel, and improve safety awareness. Set up obvious safety warning signs to prevent unrelated vessels from entering the construction area.
2. Maintenance:
Regular inspection and maintenance: Develop a scientific and reasonable maintenance plan, and regularly conduct a comprehensive inspection of the mooring system. The contents of the inspection include whether the mooring cable is worn, broken, corroded, etc., whether the anchor and chain are loose and damaged, and whether the connecting parts are firm. If the problem is found, repair or replace it in time.
Equipment maintenance: Regular maintenance of mooring equipment, such as lubrication and debugging of the anchor machine, anti-corrosion treatment of the mooring cable, etc., in order to extend the service life of the equipment and ensure its stable performance.
Monitoring and evaluation: The use of advanced monitoring technology, such as sensors to monitor the force of the mooring system, the displacement of the facility and other parameters, and the monitoring data analysis and evaluation. Based on the evaluation results, adjust maintenance policies in time, discover potential security risks in advance, and take appropriate preventive measures.